- Joined
- Jan 23, 2006
- Messages
- 15,993
- Reaction score
- 8
- Points
- 0
It's 6ft by 12ft on the side of our extension!
Hmmm, 2 weekends so far.. the outside bit all done.
A waterproof roofing to go on and then all wood to be painted and sealed, then the inside will be done. Insulated and walled inside to make it stong and warm!
Rotary washing line has been moved now!
Hmmm, 2 weekends so far.. the outside bit all done.
A waterproof roofing to go on and then all wood to be painted and sealed, then the inside will be done. Insulated and walled inside to make it stong and warm!
Rotary washing line has been moved now!